All building and structure setbacks from roads, streets, highways, etc., as prescribed
elsewhere in this chapter, shall be measured from the official right-of-way line adjacent
to the property (where full dedication has not been made) and where dedication is
greater than the minimum required, the setback for buildings and structures shall
be measured from the dedicated line.
(Ord. No. 57-19, § 31(D), 10-22-57)