§ 33-284.55. Purpose and intent.  


Latest version.
  • This article applies to two (2) contiguous areas on each side of US Highway 1. The western area is bounded by the Palmetto Expressway on the west, the Snapper Creek Expressway on the north and US Highway 1 on the east. The eastern area is bounded by US Highway 1 on the west, SW 80th Street on the north, SW 65th and SW 67th Avenues on the east, and SW 84th Street and Snapper Creek Canal on the south. The intention of this Article is to produce a Metropolitan urban center that fulfills the goals, objectives and policies of the County's Comprehensive Development Master Plan by:

    33-284-55-Fig-1-Illustrative-Plan.png

    (A)

    Coordinating the development intensity within the district by the proximity to mass transit;

    (B)

    Organizing an interconnected network of colonnaded or tree lined streets to improve pedestrian access to transit; and

    (C)

    Creating good public open space with specific square and plaza locations and by shaping the way buildings front onto the open space and streets.

    The Illustrative Plan (Figure 1), illustrates the vision and may be used to better interpret this Article. Where there is conflict between the illustrative plan and the text of this article, the text shall govern.

(Ord. No. 99-166, § 1, 12-16-99)